Sabancı Center
Akbank Tower |
General information |
Status |
Complete |
Type |
Mixed–Use |
Location |
Levent, Istanbul, Turkey |
Opening |
1993 |
Height |
Roof |
158 m (518 ft) |
Technical details |
Floor count |
39 |
Design and construction |
Architect |
Haluk Tümay, Ayhan Böke |
Developer |
Sabancı Holding |
Sabancı Center is a complex of skyscrapers which consists of two skyscrapers in Istanbul, Turkey. The third one is approved. Current tallest skyscraper of that complex is Akbank Tower.
Name |
Height m (ft) |
Floors |
Completed |
Status |
Akbank Tower |
158 (518) |
39 |
1993 |
Completed |
Sabancı Center Tower 2 |
140 (459) |
34 |
1993 |
Completed |
Sabancı Center Tower 3 |
220 (722) |
55 |
|
Proposed |
Special features of the project
- 39-floor Akbank Headquarters tower
- 34-floor Sabancı Holding tower
- Conference Center have capacity up to 638 people
- Three multi-use and audio-visual meeting rooms (up to 150+70+70) separated by portable partitions
- Sabancı Holding and Akbank Headquarter towers also have 7 meeting rooms. One of the meeting rooms has video conference system
- Restaurants and cafeterias are capable of serving 2,500 people
- VIP dining rooms
- Breakfast and café service during day
- Emergency ambulance service between 07:30 - 19:00 Monday - Saturday
- Photocopy service
- Branch bank
- Dry cleaning service
- Branch post office
- Branch "Vista" travel agency office
- 440-vehicle open and 36 vehicle closed car park
- A total of 24 elevators in the towers, including two fire and eight express elevators
- A fire warning, prevention, and intervention system that is compliance with international standards
- An energy distribution system which permits flexible office set - up and design
- Electrically commanded and controlled air-conditioning, and elevators
- Electronic security and prevention systems that meet international standards
- Modern, computer-aided building management
- Centralized clock system
- Card-controlled entrance and exit system
- Sound, music, and individual location public address system
- Inter floor document delivery via pneumatic tubes
- Satellite and radio broadcasting
- Economic energy use
Technical features of the project
- Construction type: Concrete
- Construction site area: 20.475 m2
- Total construction area: 107.000 m2
- Construction height -/+ 0.00 nominal spot height: 157.32 m
- Excavation: 250.000 m2
- Pile retaining wall: 8.350 m2
- Molds (neo-mold system): 250.000 m2
- Reinforcing rods: 10.000 ton
- Concrete: 70.000 m3
- Water proofing: 27.000 m2
- Foundations: 18.000 m3
- Aluminum: 150 ton
- Glass: 25.000 m2
See also
External links